Resource planning
Bookings sit beside capacity, leave and holidays, and beside the project forecasts they feed. Try a change as a scenario, see what it does to capacity and cost, and apply it only when it is right.
Plans: Team planning, leave and utilization on Studio and Scale. What-if scenarios: one at a time on Studio, multiple on Scale.
14-day trial of Studio. No card required.
Week planner · Kite team
| Person | Mon | Tue | Wed | Thu | Fri | Week |
|---|---|---|---|---|---|---|
| Tom LindqvistSenior designer | Kite3.5hMeridian2hKite motion3h, moving to Sam Ito 5.5h of 8h | Kite3.5hMeridian2hKite motion3h, moving to Sam Ito 5.5h of 8h | Kite3.5hMeridian2hKite motion3h, moving to Sam Ito 5.5h of 8h | Kite3.5hMeridian2hKite motion3h, moving to Sam Ito 5.5h of 8h | Kite3.5hMeridian2hKite motion3h, moving to Sam Ito 5.5h of 8h | 27.5h of 40h |
| Ana SousaBrand designer | Leave | Leave | Kite3.5hFieldnote2h 5.5h of 6h | Kite3.5hFieldnote2h 5.5h of 6h | Not working | 11h of 12h 12h approved leave |
| Grace WhitfieldStrategist | Kite2hMeridian4h 6h of 8h | Kite2hMeridian4h 6h of 8h | Kite2hMeridian4h 6h of 8h | Kite2hMeridian4h 6h of 8h | Kite2hMeridian4h 6h of 8h | 30h of 40h |
| Sam ItoMotion designer, freelance | Not working | Fieldnote3hKite motion5h, proposed 8h of 8h | Fieldnote3hKite motion5h, proposed 8h of 8h | Fieldnote3hKite motion5h, proposed 8h of 8h | Not working | 24h of 24h |
Tom Lindqvist
Senior designer
27.5h of 40h
Ana Sousa
Brand designer
11h of 12h
12h approved leave
Grace Whitfield
Strategist
30h of 40h
Sam Ito
Motion designer, freelance
24h of 24h
Move motion principles to Sam Ito
30h of Kite work moves from Tom Lindqvist at $90 an hour to Sam Ito at $70 an hour.
| Measure | Live plan | If applied |
|---|---|---|
| Kite forecast cost-$600 over the remaining work | $40,000 | $39,400 |
| Projected marginTarget 40% | 33.33% | 34.33% |
| Tom Lindqvist, this week | 42.5h of 40h | 27.5h of 40h |
| Sam Ito, this week | 9h of 24h | 24h of 24h |
Nothing in the live plan or the project forecast changes until the change is applied.
Sample week for the Kite team at Northline Studio, a fictional studio. Switch between the live plan and the proposed change to compare them.
How it works
Each person’s working days and hours, minus approved leave and studio holidays, with any overlap counted once.
Confirmed or tentative bookings by person or placeholder role, for a project and phase, in hours per day.
Draft changes against the live plan. If the live plan changes underneath a scenario, it is flagged as stale and checked again before it can be applied.
Each scenario shows its effect on capacity and on the project’s forecast cost before anything is committed.
Billable utilization and billable share are reported as two separate measures, so neither is mistaken for the other.
In practice
Leave appears in the week before anyone books over it, and capacity drops for exactly the days affected.
Plan the extra work as a scenario linked to the change request, so its cost and timing are known before the client decides.
Book a placeholder role with its own cost rate and see whether the next hire is covered by the work already planned.
Moving 30h of motion work on Kite from Tom Lindqvist to Sam Ito lowers the forecast cost by $600 and lifts the projected margin from 33.33% to 34.33%, before anything is changed.